![Bahnhof-Seddin-Wikipedia Bahnhof-Seddin-Wikipedia](https://pintsch.net/wp-content/uploads/bb-plugin/cache/bahnhof-seddin-wikipedia-panorama-7ac6104ac71275461e497d7201e91933-5d3adb36366d5.jpg)
Train formation yard Seddin – North
Product category: Shunting technology / Train formation yard (ZBA) type TMC ZBA incl. VarGBS
Country / location: Germany, Berlin Seddin – North
The train formation system Seddin – North consists of an entry group, 2 hump tracks, 28 sorting sidings equipped with shunting systems and an exit group.
The control technology replaced by PINTSCH GmbH included
- route control
- brake control
- shunting system control
- underground cable construction
- building construction (supply and equipping of technical buildings)
- supply of operator workstations